Road: | A50 |
Date: | 2017-02-08 |
Time: | 09:00 - 15:30 |
Duration: | 1 day |
Description of work: | Layby 846A and adjacent Lane 1 closure for Approx. 1km WESTBOUND for drainage gully repair works. |
Anticipated Impact: | Slight delays possible – Route unsuitable for Loads traveling which are over a 3.65m lane width. |
Connect Roads Limited registered in England and Wales with no. 2988999 registered office 350 Euston Road, Regents Place, London NW1 3AX, as agent of Balfour Beatty Group Limited, registered no. 101073, registered office. // 130 Wilton Road, London, SW1V 1LQ